Pendulum Project

Due 5:00pm, May 2, 2012 in 365B Fitzpatrick.
Post Reply
goodwine
Site Admin
Posts: 1596
Joined: Tue Aug 24, 2004 4:54 pm
Location: 376 Fitzpatrick
Contact:

Pendulum Project

Post by goodwine »

The wiki page for it is here.

The team assignments are here.

To reserve a pendulum, make sure you are logged into google apps with your ND account and go here.

You may post questions about the project as replies to this post.
Bill Goodwine, 376 Fitzpatrick
jszczud1

Re: Pendulum Project

Post by jszczud1 »

Professor,
I cannot figure out how to reserve a time for the pendulums. The calender comes up just fine, and I am signed in to google, but it won't let me create a new event.
goodwine
Site Admin
Posts: 1596
Joined: Tue Aug 24, 2004 4:54 pm
Location: 376 Fitzpatrick
Contact:

Re: Pendulum Project

Post by goodwine »

jszczud1 wrote:Professor,
I cannot figure out how to reserve a time for the pendulums. The calender comes up just fine, and I am signed in to google, but it won't let me create a new event.
Sorry about that. I didn't have the sharing settings quite right, but now it should be editable.
Bill Goodwine, 376 Fitzpatrick
pat

Re: Pendulum Project

Post by pat »

Professor, for implementing a controller, the example gives the transfer function of the force to the error, instead of the angle to the desired angle like we've done in class. Which one should we implement?
goodwine
Site Admin
Posts: 1596
Joined: Tue Aug 24, 2004 4:54 pm
Location: 376 Fitzpatrick
Contact:

Re: Pendulum Project

Post by goodwine »

pat wrote:Professor, for implementing a controller, the example gives the transfer function of the force to the error, instead of the angle to the desired angle like we've done in class. Which one should we implement?
You want to control the angle, so the transfer function you really care about is from the desired angle to the actual angle. However, your controller takes the error and decides on the pwm level, so in your code you'll have to program that.
Bill Goodwine, 376 Fitzpatrick
Jessie

Re: Pendulum Project

Post by Jessie »

Do have any specific guidelines on how you want the report to be formatted, i.e font size, spacing, section headings? Also do we each turn in our own report or one as a group? Thanks
limhoff

Re: Pendulum Project

Post by limhoff »

Professor,
for the zeta that you gave us do you want us to change the value of the zeta in the transfer function so that is that zeta. Do you want us then to change all corresponding data as though we had gotten that zeta when we solved for zeta initially? Also would you want us to graph that transfer function on the graphs that we got when we did ran the four torque values, or would you still want the zeta we initially solved for?
Thanks
goodwine
Site Admin
Posts: 1596
Joined: Tue Aug 24, 2004 4:54 pm
Location: 376 Fitzpatrick
Contact:

Re: Pendulum Project

Post by goodwine »

limhoff wrote:Professor,
for the zeta that you gave us do you want us to change the value of the zeta in the transfer function so that is that zeta. Do you want us then to change all corresponding data as though we had gotten that zeta when we solved for zeta initially? Also would you want us to graph that transfer function on the graphs that we got when we did ran the four torque values, or would you still want the zeta we initially solved for?
Thanks
No, the zeta you find in the system identification is the damping ratio the pendulum actually has as part of the system. The assigned zeta is the damping ratio I want the closed-loop controlled system to exhibit.